Pre Engineered Building Structure Construction
  • Pre Engineered Building Structure Construction
  • Pre Engineered Building Structure Construction
  • Pre Engineered Building Structure Construction

Pre Engineered Building Structure Construction

Brand SYLY

Product origin China

Delivery time 30working days

Supply capacity 5000tons/month

1. The pre engineered building construction of steel structure buildings is not affected by seasons. Not like traditional brick and cement structure buildings. Steel structure buildings do not need to mix cement with water, so no need to worry about the low temperature to freeze the water.
2. Pre engineered building structure is more and more popular with the customers. It is mainly used for large-span structures, workshops, warehouses, office buildings, large supermarkets, logistics warehouses, showrooms, hangar, etc.
3. Prefabricated steel structures arrive at the construction site in ready-to-assemble sections. All you have to do is lay it out and about it together. As most kits arrive with all components included. No need for preparation additionally.

Pre Engineered Building Structure Construction

Quick Details

Type

steel shopping building

Warranty

3 years

Afrer-sale Service

Online technical support

Onsite Installation

Onsite Training

Onsite Inspection

Free spare parts,

Teturn and Replacement

Project Solution Capability:

graphic design

3D model design

Total solution for projects

Cross Categories Consolidation 

Standard

GB standard

Design Style

Transitional

Place of Origin

Liaoning, China

Brand Name

SYLY

Certificate

ISP9001:2008

Purlin

C shape purlin

Wind loading

200km/h

Life time

50 years

Surface treatment

Anti-rust painting or galvanized

Door

Rolling door or sandwich panel door

Roof and wall

Single layer sheet or sandwich panel

Window

PVC or aluminium window

pre engineered building construction

Products Description

Items

Specification

Main structure

PEB welded H-shaped steel or hot rolled steel, Q355 or Q235

Anti-rust protection

Hot dip galvanized or anti-rust painting

Purlin and girts

Cold rolled C or Z steel, Q355 or Q235

Roof and wall

Single layer steel sheet or sandwich panel

Gutter

Heavyduty galvanized steel

Downpipe

PVC

Door

Sliding door or roller shutter

Windows

PVC or aluminum alloy

Other components available upon request. Please provide the following information for detailed custom design.

pre engineered building structure

The advantage of prefab steel shopping mall

(Used in our  China Manufacturers Prefab Supermarket Building Material Price)

1. The tensile strength of steel is much times greater than concrete.


2. Steel is also ductile in nature.


3. Steel has also a high strength to weight ratio as compared to concrete.


4. Steel structures are also preferred when the time span is small. The construction rate is very fast.


5. Steel bars are also reusable. 


6. Steel structures can be extended in any direction.


7. Steel has smaller columns as compared to concrete columns, so due to this more space will be available for some other functions.


8. As steel structures are lighter than concrete, therefore there is less cost used and the foundation of the structure becomes less expensive.


9. Steel structures are cost-effective

pre engineered buildings


The prefab metal shopping mall buildings are extremely easy to assemble. Each piece is clearly marked for easy identification.  The whole building erects step-by-step in a logical manner, with high-strength bolts and self-drilling screws.  It is much like a giant erector set.

For steel structure shopping mall buildings, we can provide design solutions to ensure that the project is complete, stable and beautiful.

pre engineered building construction

Quote information

Could you tell me your requirement for your steel structure project?

Basic design requirements and design Load,

1.     Project site location:

2.     Overall dimension (length*width*eave height in meters):

3.     Mezzanine of not? How many kgs of load per square meter on mezzanine?

4.     Single-layer steel sheet wall or sandwich panel wall:

5.     Snow load if applicable:

6.     Wind speed/load:

7.     Interior column allowed or not:

8.     Overhead crane needed or not, capacity:

9.     Any other particular requirements:

pre engineered building structure

Certifications

pre engineered buildings

Company Profile

pre engineered building construction

Our group headquarters is located in Shenyang. Our manufacturing facilities are located in Liaoning, Shandong, Hebei, and Heilongjiang. We have the best quality of manufacturing equipment and a group of outstanding technical personnel. We have accumulated a wealth of practical experience in steel structure fabrication and installation and passed ISO9001:2000 quality management system certification.

With the purpose of “Market is the lead, Quality is the center, Treat the client with friendly service”, our company has become a modern enterprise integrating with manufacture and construction as a whole. Our company offers the whole set of services of all kinds of light steel buildings including design, manufacture, and construction. Our company emphasizes contract complying with credibility with rigorous product manufacturing processes.


1. The pre engineered building construction of steel structure buildings is not affected by seasons. Not like traditional brick and cement structure buildings. Steel structure buildings do not need to mix cement with water, so no need to worry about the low temperature to freeze the water.

2. Pre engineered building structure is more and more popular with the customers. It is mainly used for large-span structures, workshops, warehouses, office buildings, large supermarkets, logistics warehouses, showrooms, hangar, etc.

3. Prefabricated steel structures arrive at the construction site in ready-to-assemble sections. All you have to do is lay it out and about it together. As most kits arrive with all components included. No need for preparation additionally. 

pre engineered building structure

Packing Logistics


Fixed packing, loading, transportation, unloading the matters needing attention:

(1) The lifting large there must be a person responsible for the use of fixture, suitable, strictly abide by the rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.

(2) At the time of loading, there must be a special supervision, check car number and packing, the car pile up securely, and to increase the necessary binding component loosening, prevent the loss.

(3) Remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle.

(4) No rough handling, loading and unloading personnel handling, weight, size should be familiar with the components, and check the horse sling, rigging, prevent accidents.

(5) The member to the construction site, timely organization of unloading, stacking area.

(6) The crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision.

pre engineered buildings




Project Cases

pre engineered building construction

Steel structure building project in the USA

pre engineered building structure

Steel structure building project in Georgia

pre engineered buildings

Steel structure building project in the Democratic Republic of the Congo

pre engineered building construction

Steel structure building project in Mozambique

pre engineered building structure

Steel structure building project in Togo


Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy

close left right