Prefab Aircraft Hangar Steel Buildings Cost
  • Prefab Aircraft Hangar Steel Buildings Cost

Prefab Aircraft Hangar Steel Buildings Cost

Brand SYLY

Product origin China

Delivery time 30working days

Supply capacity 5000tons/month

1. The steel structure hangar has the characteristics of large span, and the amount of steel used has been designed to ensure safety.
2. The aircraft hangar is very cheap and quick, so the warehouse can help customers save money and time.
3. Aircraft hangar buildings have the characteristics of oxidation resistance and corrosion resistance.
4. The aircraft hangar steel buildings has a large capacity, with reliable structure: safety and environmental protection, to meet the requirements of building structure design code.
5. Prefab aircraft hangar are built by professional workers, with reliable quality, so their durable features can make consumers rest assured to use

Prefab Aircraft Hangar Steel Buildings Cost

Quick Details

Type

hangar

Warranty

3 years

Afrer-sale Service

Online technical support

Onsite Installation

Onsite Training

Onsite Inspection

Free spare parts,

Teturn and Replacement

Project Solution Capability:

graphic design

3D model design

Total solution for projects

Cross Categories Consolidation 

Standard

GB standard

Design Style

Transitional

Place of Origin

Liaoning, China

Brand Name

SYLY

Certificate

ISP9001:2008

Purlin

C shape purlin

Wind loading

200km/h

Life time

50 years

Surface treatment

Anti-rust painting or galvanized

Door

Rolling door or sandwich panel door

Roof and wall

Single layer sheet or sandwich panel

Window

PVC or aluminium window

aircraft hangar   

Products Description


Items

Specification

Main structure

PEB welded H-shaped steel or hot rolled steel, Q355 or Q235

Anti-rust protection

Hot dip galvanized or anti-rust painting

Purlin and girts

Cold rolled C or Z steel, Q355 or Q235

Roof and wall

Single layer steel sheet or sandwich panel

Gutter

Heavyduty galvanized steel

Downpipe

PVC

Door

Sliding door or roller shutter

Windows

PVC or aluminum alloy

Other components available upon request. Please provide the following information for detailed custom design.


aircraft hangar buildings

Steel aircraft hangars

Metal building kits for custom aircraft hanger for sale with


hangar accessories, windows, and bi-fold doors.


The rigid frame straight wall metal building kit is among the most widely used building for airplane hangars. The building is certified for hurricane force winds and heavy snow loads and is virtually maintenance free. The steel structure is sealed tight and mostly impervious to rodents and pests that could get into your engines. With insulated roof and wall cladding along with the proper ventilation your aircraft hangar will have the perfect environment for storing your airplanes or other aircraft.


The steel structure building has better durability than other material building such as brick and concrete structures. The steel structure housing structure is composed of a cold-formed steel system, which can be galvanized or anti-rust painting. The service life of the main structure can reach more than 50 years.


Steel structure is widely used as steel structure industrial factory, steel frame warehouse, steel office building, steel structure gymnasiums building, steel aircraft hangars, metal framing shed, steel commercial workshop building, etc.


The cost of steel structure workshop is reasonable, lightweight, reduce the cost of the foundation, fast construction, comprehensive economic benefits are greatly better than the concrete building and block building.

aircraft hangar steel buildings

aircraft hangar

Quote information

Could you tell me your requirement for your steel structure project?

Basic design requirements and design Load,

1.     Project site location:

2.     Overall dimension (length*width*eave height in meters):

3.     Mezzanine of not? How many kgs of load per square meter on mezzanine?

4.     Single-layer steel sheet wall or sandwich panel wall:

5.     Snow load if applicable:

6.     Wind speed/load:

7.     Interior column allowed or not:

8.     Overhead crane needed or not, capacity:

9.     Any other particular requirements:

aircraft hangar buildings

Certifications

aircraft hangar steel buildings

Company Profile

aircraft hangar

Our group headquarters is located in Shenyang. Our manufacturing facilities are located in Liaoning, Shandong, Hebei, and Heilongjiang. We have the best quality of manufacturing equipment and a group of outstanding technical personnel. We have accumulated a wealth of practical experience in steel structure fabrication and installation and passed ISO9001:2000 quality management system certification.


With the purpose of “Market is the lead, Quality is the center, Treat the client with friendly service”, our company has become a modern enterprise integrating with manufacture and construction as a whole. Our company offers the whole set of services of all kinds of light steel buildings including design, manufacture, and construction. Our company emphasizes contract complying with credibility with rigorous product manufacturing processes.

aircraft hangar buildings

Packing Logistics


Fixed packing, loading, transportation, unloading the matters needing attention:

(1) The lifting large there must be a person responsible for the use of fixture, suitable, strictly abide by the rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.

(2) At the time of loading, there must be a special supervision, check car number and packing, the car pile up securely, and to increase the necessary binding component loosening, prevent the loss.

(3) Remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle.

(4) No rough handling, loading and unloading personnel handling, weight, size should be familiar with the components, and check the horse sling, rigging, prevent accidents.

(5) The member to the construction site, timely organization of unloading, stacking area.

(6) The crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision.


Project Cases

aircraft hangar steel buildings

aircraft hangar

Steel structure building project in the USA

aircraft hangar buildings

Steel structure building project in the Georgia

aircraft hangar steel buildings

Steel structure building project in the Democratic Republic of the Congo

aircraft hangar

Steel structure building project in the Mozambique

aircraft hangar buildings

Steel structure building project in the Togo


Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy

close left right