Prefab Warehouse Buildings
Brand SYLY
Product origin China
Delivery time 30 working days
Supply capacity 5000 tons/month
1. Lower price, Higher quality, professional logistics, CE and AISC certificate.
2. Prefab warehouse buildings take less time to build and can get a quick return on investment.
3. Prefab warehouse buildings are light weight, high strength, easy to move, and the materials can be recycled, which is very environmental friendly.
Quick Details
Type | Prefab Warehouse Buildings | Warranty | 3 years |
Afrer-sale Service | Online technical support Onsite Installation Onsite Training Onsite Inspection Free spare parts, Teturn and Replacement | Project Solution Capability: | graphic design 3D model design Total solution for projects Cross Categories Consolidation Prefab Warehouse Buildings |
Standard | GB standard | Design Style | Transitional |
Place of Origin | Liaoning, China | Brand Name | SYLY |
Certificate | ISP9001:2008 | Purlin | C shape purlin |
Wind loading | 200km/h | Life time | 50 years |
Surface treatment | Anti-rust painting or galvanized | Door | Rolling door or sandwich panel door |
Roof and wall | Single layer sheet or sandwich panel | Window | PVC or aluminium window |
Products Description
Items | Specification |
Main structure | PEB welded H-shaped steel or hot rolled steel, Q355 or Q235 |
Anti-rust protection | Hot dip galvanized or anti-rust painting |
Purlin and girts | Cold rolled C or Z steel, Q355 or Q235 |
Roof and wall | Single layer steel sheet or sandwich panel |
Gutter | Heavyduty galvanized steel |
Downpipe | PVC |
Door | Sliding door or roller shutter |
Windows | PVC or aluminum alloy |
Other components available upon request. Please provide the following information for detailed custom design. |
H-Shaped Steel The advantages of our products: high-performance thermal insulation, ventilation, moisture-proof materials provide extremely high living comforts. | C-Shaped Steel The advantages of this approach is durable life long, the production of high degree of industrialization, quality and stability. So heavily used by atmospheric corrosion is serious and difficult maintenance of outdoor steel structure. | Sandwich Panel Sandwich panel is suitable for prejects with high fireproof requirement. With good sound-proof effect.In addition, noise indoor caused by rain and hail are weakened obviously after sandwich used |
METAL OFFICE BUILDINGS
MAKE YOUR OFFICE SPACE WORK FOR YOU
Heritage metal buildings offer business owners and real estate developers the opportunity to create custom spaces to meet your company’s needs. Each office building we manufacture is designed to include enough space for employee offices, conference rooms, storage and any other room you require. Steel buildings are also a better investment than traditional building materials as their energy efficiency reduces costs and their durability results in less maintenance costs.
During the design and manufacturing phases of your building, you will work closely with one of our experienced project consultations. As the manufacturer, Heritage delivers high quality buildings directly to your worksite and while we do not aid in building erection, we do provide technical support during the construction phase.
1.Choosing to build steel structure prefab warehouse buildings can get a fast return on investment than traditional brick and cement structure buildings. Because prefab warehouse buildings need less time to build than traditional brick and cement structure buildings.
2.The prefab warehouse buildings is lightweight, high strength, easy to move, materials can be recycled used, very environmentally. They are time saved, cost saved.70 ears durable use, no construction waste.71. Steel structure buildings are flexible layouts. Good ductility, strong plasticity, and deformability, high seismic resistance, and wind resistance. Quick build and long service time. Lightweight, high quality, and low cost. Environmental, Material can be 100% recycled or degraded.
Quote information
Could you tell me your requirement for your steel structure project?
Basic design requirements and design Load,
1. Project site location:
2. Overall dimension (length*width*eave height in meters):
3. Mezzanine of not? How many kgs of load per square meter on mezzanine?
4. Single-layer steel sheet wall or sandwich panel wall:
5. Snow load if applicable:
6. Wind speed/load:
7. Interior column allowed or not:
8. Overhead crane needed or not, capacity:
9. Any other particular requirements:
Building Purpose: we will recommend the best design for the purpose of the building
A. Warehouse/Storage
B. Factory
C. Agriculture Barn
D. Retail Store
E. Repair/Mechanic Shop
F. Office Space
G. Medical Warehouse
H. Animal Farm (please confirm what kind of animal)
Certifications
Packing Logistics
Fixed packing, loading, transportation, unloading the matters needing attention:
(1) The lifting large there must be a person responsible for the use of fixture, suitable, strictly abide by the rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.
(2) At the time of loading, there must be a special supervision, check car number and packing, the car pile up securely, and to increase the necessary binding component loosening, prevent the loss.
(3) Remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle.
(4) No rough handling, loading and unloading personnel handling, weight, size should be familiar with the components, and check the horse sling, rigging, prevent accidents.
(5) The member to the construction site, timely organization of unloading, stacking area.
(6) The crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision.
Project Cases
Steel structure building project in the USA
Steel structure building project in the Georgia
Steel structure building project in the Democratic Republic of the Congo
Steel structure building project in the Mozambique
Steel structure building project in the Togo