-
Pre Manufactured warehouse structure Metal Buildings
1. PEB construction time is shortened Prefabricated steel building projects only need to be assembled at the construction site, all other work is done at the fabrication unit. Therefore, they are completed in a short period of time, ensuring a high interest rate (ROI). The same project that might take about a year to complete in civil construction can be completed in seven to eight months if multi-rise steel structures are chosen. 2. Pre manufactured buildings provides more availability zones Span widths in PEB structures Metal Buildings are wider, which means they provide more usable area. Floor slab widths in PEB are also smaller than those in civil structures, so they also provide a more usable area in terms of height. 3. PEB pre manufactured metal buildings can have a concrete-like wall finish To look like concrete from the outside, light weight ACC blocks can be used, which can be installed on steel columns or rafter walls in multi-storey steel structures. Not only do they give the building the appearance of a civil building from the outside, thereby increasing its aesthetic value, but they also make the construction process faster and lighter.
Send Email Details