-
Structural Steel Warehouse Storage Shed Buildings
1. The structural steel warehouse mainly uses sandwich panels as walls and roofs. Such as EPS sandwich panel or PU sandwich panel. All these materials can provide excellent thermal insulation. Better than traditional materials such as brick and concrete walls.
Send Email Details
2. The steel structure building storage shed mainly uses sandwich panels as walls and roofs. Such as EPS sandwich panel or PU sandwich panel. All these materials can provide excellent sound insulation. Better than traditional materials such as brick and concrete walls.
3. Due to steel structure storage buildings carrying out professional production with a high degree of mechanization in the factory, so steel structure buildings have the characteristics of high production efficiency. Bring greater profits to users. -
Two Story Steel Structure Warehouse Building
1. The warehouse steel structure warehouse building have high strength and long lifespan, they can be used for more than 70 years. The building can be single or multiple spans. It can have a maximum span distance of 48m without middle columns.
Send Email Details
2. The warehouse structures is windproof and reliable load-bearing, it is convenient to take apart and install. It is highly anti-corrosion and dust-proof. Eco-friendly - highly recyclable and creates minimal raw material waste.
3. The stwo story warehouse is widely Used as factory, warehouse, office building, aircraft hangar, etc. Steel structure building is designed and fabricated in-factory with strict quality control. -
Prefabricated Metal Warehouse Steel Structure
Prefabricated Metal Warehouse Steel Structure
1. The prefabricated warehouse steel structure have many methods to avoid rust. Can use anti-rust painting, galvanized, or Pickling and Passivation treatment. The price of this treatment is different, customers can choose their favorite method to keep steel structure buildings away from rust.
2. The steel structure prefabricated metal warehouse are easier to transport than traditional brick and cement structure buildings. Only using a container to load and transport. No need for special vehicles such as Cement Tank Car and other special using vehicles.
3. The steel structure prefabricated warehouse workshop buildings need less time to build than traditional brick and cement structure buildings. The normal project only needs about six months to build. But traditional brick and cement structure buildings need more time to build.prefabricated warehouse steel structure prefabricated metal warehouse Prefabricated Steel Structure warehouseSend Email Details -
Warehouse Steel Structure
1. Different types and sizes according to customer's needs, large or small, Single span or multiple spans, the max span is 48m without middle column. Unit price can lower to 30USD/sqm according to customer's requests.
Send Email Details
2. Fast construction and easy installation, time-saving, and labor-saving, all the items are factory-made, pre-cut, pre-welded, pre-drilled, pre-painted. environmental protection, stable structure, and safe enough.
3. Steel structure building shed warehouse is low cost and maintenance high earthquake-proof, waterproof and fireproof, nice appearance and energy conserving. Reduced construction waste, long using lifespan: up to 70 years. The cost of steel structure warehouse steel structure is reasonable, lightweight, reduce the cost of the foundation, fast construction, comprehensive economic benefits are greatly better than the concrete building and block building.