Metal Building Basketball Gym
  • Metal Building Basketball Gym
  • Metal Building Basketball Gym
  • Metal Building Basketball Gym

Metal Building Basketball Gym

Brand SYLY

Product origin China

Delivery time 30 working days

Supply capacity 5000tons/month

1. The lightweight of Metal Building Basketball Gym material its-self., compared with traditional steel-reinforced concrete, steel structure has the advantage of lightweight material its-self. The self-weight of the building is only one-fifth of that of the brick concrete structure.
2. Metal Building Basketball Gym is a Good environmental protection effect. Construction greatly reduces sand, stone, and the dosage of the ash. Most of the used materials are recyclable or degradable, little rubbish produced steel frame structures.
3. The metal building gym with steel structure building has better durability than other material building such as brick and concrete structures. The steel structure housing structure is composed of a cold-formed steel system, which can be galvanized or anti-rust painting. The service life of the main structure can reach more than 50 years.

Metal Building Basketball Gym

Quick Details

Type

Metal Building Basketball Gym

Warranty

3 years

Afrer-sale Service

Online technical support

Onsite Installation

Onsite Training

Onsite Inspection

Free spare parts,

Teturn and Replacement

Project Solution Capability:

graphic design

3D model design

Total solution for projects

Cross Categories Consolidation 

Standard

GB standard

Design Style

Transitional

Place of Origin

Liaoning, China

Brand Name

SYLY

Certificate

ISP9001:2008

Purlin

C shape purlin

Wind loading

200km/h

Life time

50 years

Surface treatment

Anti-rust painting or galvanized

Door

Rolling door or sandwich panel door

Roof and wall

Single layer sheet or sandwich panel

Window

PVC or aluminium window

metal building gym   

Products Description

Items

Specification

Main structure

PEB welded H-shaped steel or hot rolled steel, Q355 or Q235

Anti-rust protection

Hot dip galvanized or anti-rust painting

Purlin and girts

Cold rolled C or Z steel, Q355 or Q235

Roof and wall

Single layer steel sheet or sandwich panel

Gutter

Heavyduty galvanized steel

Downpipe

PVC

Door

Sliding door or roller shutter

Windows

PVC or aluminum alloy

Other components available upon request. Please provide the following information for detailed custom design.


Steel Gymnasiums

A steel building from General Steel is the modern solution for gymnasiums. Cities, schools, churches, and private clubs are taking advantage of steel construction on gymnasiums across the country. Steel structures feature clear span framing, allowing for the column-free interiors and high ceilings that metal gymnasiums require. Every steel building from General Steel is designed according to use, you’ll work closely with our design team to maximize your space.The steel structure gym meets your needs and can be used as a basketball hall, volleyball hall, indoor football hall, etc.


1. The lightweight of Metal Building Basketball Gym material its-self., compared with traditional steel-reinforced concrete, steel structure has the advantage of lightweight material its-self. The self-weight of the building is only one-fifth of that of the brick concrete structure.

2. Metal Building Basketball Gym is a Good environmental protection effect. Construction greatly reduces sand, stone, and the dosage of the ash. Most of the used materials are recyclable or degradable, little rubbish produced steel frame structures.

3. The metal building gym with steel structure building has better durability than other material building such as brick and concrete structures. The steel structure housing structure is composed of a cold-formed steel system, which can be galvanized or anti-rust painting. The service life of the main structure can reach more than 50 years.




metal building basketball gym


metal building gym

metal building basketball gym

Quote information

Could you tell me your requirement for your steel structure project?

Basic design requirements and design Load,

1.     Project site location:

2.     Overall dimension (length*width*eave height in meters):

3.     Mezzanine of not? How many kgs of load per square meter on mezzanine?

4.     Single-layer steel sheet wall or sandwich panel wall:

5.     Snow load if applicable:

6.     Wind speed/load:

7.     Interior column allowed or not:

8.     Overhead crane needed or not, capacity:

9.     Any other particular requirements:


metal building gym

Certifications

metal building basketball gym

Company Profile

metal building gym

Our group headquarters is located in Shenyang. Our manufacturing facilities are located in Liaoning, Shandong, Hebei, and Heilongjiang. We have the best quality of manufacturing equipment and a group of outstanding technical personnel. We have accumulated a wealth of practical experience in steel structure fabrication and installation and passed ISO9001:2000 quality management system certification.


With the purpose of “Market is the lead, Quality is the center, Treat the client with friendly service”, our company has become a modern enterprise integrating with manufacture and construction as a whole. Our company offers the whole set of services of all kinds of light steel buildings including design, manufacture, and construction. Our company emphasizes contract complying with credibility with rigorous product manufacturing processes.

metal building basketball gym

Packing Logistics


Fixed packing, loading, transportation, unloading the matters needing attention:

(1) The lifting large there must be a person responsible for the use of fixture, suitable, strictly abide by the rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.

(2) At the time of loading, there must be a special supervision, check car number and packing, the car pile up securely, and to increase the necessary binding component loosening, prevent the loss.

(3) Remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle.

(4) No rough handling, loading and unloading personnel handling, weight, size should be familiar with the components, and check the horse sling, rigging, prevent accidents.

(5) The member to the construction site, timely organization of unloading, stacking area.

(6) The crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision.


metal building gym

metal building basketball gym

Project Cases

metal building gym

Steel structure building project in the USA

metal building basketball gym

Steel structure building project in the Georgia

metal building gym

Steel structure building project in the Democratic Republic of the Congo

metal building basketball gym

Steel structure building project in the Mozambique

metal building gym

Steel structure building project in the Togo


Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy

close left right