Steel Metal Gymnasiums Pre-engineered
Brand SYLY
Product origin China
Delivery time 30 working days
Supply capacity 5000tons/month
1. The design and formation of steel metal gymnasiums steel structure buildings are very simple. And the lightweight of the steel gymnasiums pre-engineered itself. So, the cost of building a steel structure building is much cheaper than other material building such as brick and concrete structures.
2. The metal gymnasium building mainly uses sandwich panels as walls and roofs. Such as EPS sandwich panel or PU sandwich panel. All these materials can provide excellent sound insulation. Better than traditional materials such as brick and concrete walls.
3. The metal gymnasium building is suitable for both single-story steel structure warehouse, or large-span steel workshop buildings and multi-story steel structures or high-rise steel metal buildings.
Components are prefabricated in the factory, the site only need assemble as per construction drawings, which greatly shorten the construction time.
Quick Details
Type | Steel Metal Gymnasiums Pre-engineered | Warranty | 3 years |
Afrer-sale Service | Online technical support Onsite Installation Onsite Training Onsite Inspection Free spare parts, Teturn and Replacement | Project Solution Capability: | graphic design 3D model design Total solution for projects Cross Categories Consolidation |
Standard | GB standard | Design Style | Transitional |
Place of Origin | Liaoning, China | Brand Name | SYLY |
Certificate | ISP9001:2008 | Purlin | C shape purlin |
Wind loading | 200km/h | Life time | 50 years |
Surface treatment | Anti-rust painting or galvanized | Door | Rolling door or sandwich panel door |
Roof and wall | Single layer sheet or sandwich panel | Window | PVC or aluminium window |
Products Description
Items | Specification |
Main structure | PEB welded H-shaped steel or hot rolled steel, Q355 or Q235 |
Anti-rust protection | Hot dip galvanized or anti-rust painting |
Purlin and girts | Cold rolled C or Z steel, Q355 or Q235 |
Roof and wall | Single layer steel sheet or sandwich panel |
Gutter | Heavyduty galvanized steel |
Downpipe | PVC |
Door | Sliding door or roller shutter |
Windows | PVC or aluminum alloy |
Other components available upon request. Please provide the following information for detailed custom design. |
Steel Gymnasiums
A steel building from General Steel is the modern solution for gymnasiums. Cities, schools, churches, and private clubs are taking advantage of steel construction on gymnasiums across the country. Steel structures feature clear span framing, allowing for the column-free interiors and high ceilings that metal gymnasiums require. Every steel building from General Steel is designed according to use, you’ll work closely with our design team to maximize your space.The steel structure gym meets your needs and can be used as a basketball hall, volleyball hall, indoor football hall, etc.
1. The design and formation of steel metal gymnasiums steel structure buildings are very simple. And the lightweight of the steel gymnasiums pre-engineered itself. So, the cost of building a steel structure building is much cheaper than other material building such as brick and concrete structures.
2. The metal gymnasium building mainly uses sandwich panels as walls and roofs. Such as EPS sandwich panel or PU sandwich panel. All these materials can provide excellent sound insulation. Better than traditional materials such as brick and concrete walls.
3. The metal gymnasium building is suitable for both single-story steel structure warehouse, or large-span steel workshop buildings and multi-story steel structures or high-rise steel metal buildings.
Components are prefabricated in the factory, the site only need assemble as per construction drawings, which greatly shorten the construction time.
Quote information
Could you tell me your requirement for your steel structure project?
Basic design requirements and design Load,
1. Project site location:
2. Overall dimension (length*width*eave height in meters):
3. Mezzanine of not? How many kgs of load per square meter on mezzanine?
4. Single-layer steel sheet wall or sandwich panel wall:
5. Snow load if applicable:
6. Wind speed/load:
7. Interior column allowed or not:
8. Overhead crane needed or not, capacity:
9. Any other particular requirements:
Certifications
Company Profile
Our group headquarters is located in Shenyang. Our manufacturing facilities are located in Liaoning, Shandong, Hebei, and Heilongjiang. We have the best quality of manufacturing equipment and a group of outstanding technical personnel. We have accumulated a wealth of practical experience in steel structure fabrication and installation and passed ISO9001:2000 quality management system certification.
With the purpose of “Market is the lead, Quality is the center, Treat the client with friendly service”, our company has become a modern enterprise integrating with manufacture and construction as a whole. Our company offers the whole set of services of all kinds of light steel buildings including design, manufacture, and construction. Our company emphasizes contract complying with credibility with rigorous product manufacturing processes.
Packing Logistics
Fixed packing, loading, transportation, unloading the matters needing attention:
(1) The lifting large there must be a person responsible for the use of fixture, suitable, strictly abide by the rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.
(2) At the time of loading, there must be a special supervision, check car number and packing, the car pile up securely, and to increase the necessary binding component loosening, prevent the loss.
(3) Remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle.
(4) No rough handling, loading and unloading personnel handling, weight, size should be familiar with the components, and check the horse sling, rigging, prevent accidents.
(5) The member to the construction site, timely organization of unloading, stacking area.
(6) The crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision.
Project Cases
Steel structure building project in the USA
Steel structure building project in the Georgia
Steel structure building project in the Democratic Republic of the Congo
Steel structure building project in the Mozambique
Steel structure building project in the Togo